- Overview
- Company Profile
- Product Description
- Our Advantages
- HordRT Team
- Our Mold Factory
- Our Injection Molding Factory
- Quality Assurance Inspections
- Certificates
Basic Info.
Packaging & Delivery
Product Description
Covering an area of 2,1000 square meters and having over 250 employees, our factory is equipped with advanced injection molding machines, CNC machines, inspection equipment, etc. We have excellent in-house production capacity and refined manufacturing processes to deliver high-quality production parts at cost-effective prices. Meanwhile, backed by stable material suppliers. Strict quality control covers every procedure, from material sourcing and processing to testing and packing.
With high-quality products, excellent service, and a good reputation, we have won great support from customers around the world. We are looking forward to good cooperation with partners at home and abroad to create a glorious future.
Service | Custom rapid tooling & small-volume production including plastic Injection molding |
Quotation | Quote as per your drawing/design(size, material, feature and structure, processing method, and required technology, etc) |
Tolerance & Surface Roughness | Customize available |
Materials Available | ABS,PC,PEEK,TPE,PA66,etc.(other specified material) |
Processing | Injection molding |
Payment method | T/T, wire transfer, Paypal, etc |
Drawing Formats | STP, IGS, Auto CAD, Solid Works, UG, CAD, PDF, etc. |
MOQ | No MOQ requirement for common parts, except for the MOQ of special materials required by the resin supplier. |
One-Stop Service
Hundreds of MUD mold base making to achieve the cost and lead time-saving!
1. Instant quote: Response within 24 hours
2. Cost saving: quote with MUD mold base
3. Quick Turnaround: 7-14 days for mold making after DFM/drawing is confirmed. It depends on the complexity of the Design.
4. No MOQ Requirement, except for the MOQ of special material required by the resin supplier.
5. DFM Analysis: Preliminary DFM provided if needed at the quotation stage. Formal DFM is provided after the order is confirmed.
6.T1/T0 samples were provided to customers for further check after the mold trial.
7. Inspection report: FAI and dimensional report provided if needed.
8. Logistics: we have our own logistic team for the shipment arrangement.
Quality Control at Every Step
2. Provide related files(drawings) if possible.
3. Tell us your requirement(Material/Qty/Surface finish/etc) for parts.
4. Analyze with our engineers and get back a quote within 24 hours.
A1. We guarantee to keep your design and content secure and confidential. If needed, we can sign an NDA document for you. You can send your company's NDA to us directly, and we will sign it back to you.
Q2. Are the lead times in working days or calendar days?
A2. The lead times are quoted in calendar days. That is calculated from the approval of the DFM and the beginning of the actual production.
Q3. What are the shipping terms of HordRT?
A3. For regular production orders, our standard terms are Ex Works (EXW), which means that the customer is responsible for shipping, customs clearance, and all other associated fees once the goods have left our premises.
Q4. What are the advantages of HordRT compared with other suppliers?
A4. 1. Support rapid tooling and low-volume production
2. Making hundreds of shared mold bases(MUD) to save costs and time for customers.
3. Equipped with a great deal of advanced injection molding machines, CNC machines, inspection equipment, etc.
4. Choose a suitable processing method for different designs based on the consideration of cost/qty/lead-time/design and so on.
Q5.What are the payment terms of HordRT?
A5.1.Typically, all tooling orders require a 50% deposit in advance, the balance needs to be paid before the T1 sample is shipping.
2. The CNC machining parts require 100% payment before shipment.
3. Unless otherwise agreed, the amount due shall be paid by bank transfer as designated by HordRT
Let us help you provide high-quality parts in a short time.
Get your project started now!